Customization: | Available |
---|---|
Building Materials: | Steel Structure |
Cover Material: | Glass |
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make on Made-in-China.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
1.Glass greenhouse is a type of greenhouse covered by glass as lighting materials, which belongs to a kind of greenhouse and in cultivation facility.
Multi-span glass agricultural greenhouses
|
|||
Basic Parameters
|
Wind Load
|
0.5KN/m²
|
|
Snow Load
|
0.35KN/m²
|
||
Maximum drainage capacity
|
140mm/h
|
||
Technical parameters
|
Span Width
|
6.4m, 8m, 9.6m, 10.8m, 12.8m or customized
|
|
Column Spacing
|
4.0m, 8.0m or customized
|
||
Shoulder high
|
3.0m - 6.0m or customized
|
||
Steel Structure
|
Hot dip galvanized steel tubes
|
||
Covering Material
|
hollow tempered glass or Single tempered glass
|
||
Greenhouse Systems
|
Top window system, fan system, wet curtain system, external shading system, internal shading system, internal thermal insulation
system, seedbed system, light filling system, heating system, etc |
||
We will provide the design plan according to the customer's request.
|
1.How long is the delivery time?
According to your greenhouse size and system, the delivery time is usually 10-60days.
2.How long is the warranty period?
Different parts have different warranty, usually the electric machine guarantee 1 year, the steel structure 5years, glass 1 year, sunshade net 2-3years, etc.
3.Is your company foreign trade company or manufacturer?
we are manufacturer.
4.Can you supply sample?
Small parts can be supplied, but you should pay the express.
5.Can your company supply greenhouse design?
Our company can give greenhouse design according to your land and plan after deposit. And we can give simple drawing before signing contract.
6. How to install greenhouse?
First we prepare the material and export.
After your customs clearing, we send 2-4 engineers or all workers to guide to install.
If you want to save money, we only send engineers, and you match local workers. If you think it is hard to do, we also can send engineers and workers to install for you.
7.When installing, what cost should we pay?
our engineers and workers visas and round-trip tickets, their foods and accommodation, their communication.
8.What is the payment terms?
usually the deposit is 30%-50% of total value. Before loading, all the balance should be paid off. Or you can give your own payment terms, then we can negotiate it.